Supplier Evaluation Process
Definitions
- Supplier: Entity responsible for the product, process, or service, capable of demonstrating the application of a Quality Management System.
- Evaluation: Activity aimed at verifying that a supplier meets the necessary conditions to satisfy the quality requirements demanded by PERINOX, S.A. in order to supply materials, components, or services.
Execution / Flowchart Text Description

Classification
Suppliers are classified into three levels depending on the final result of the rating. The following table details the levels and the actions to be taken in each case:
| LEVEL | SCORE | CONSEQUENCE / ACTION |
| A | 300 – 400 | APPROVED Authorized for continuous supply. Re-evaluation every three years, except in case of severe quality or logistical issues, or changes in location or Management. |
| B | 200 – 300 | APPROVED Authorized for specific supply (New and sporadic clients). Perform qualitative and quantitative inspection upon receipt. Re-evaluation within three years, except in case of severe quality or logistical issues, or changes in location or Management. |
| C | <200 | NOT APPROVED – DO NOT CONTRACT |
1. Supplier history – Incidents / No. of supplies: 0 – 200 points (50%)
2. PERINOX Assessment (Purchasing Dept.): 0 – 200 points (50%)
- The evaluation by the purchasing department will largely depend on the documentation provided by the supplier along with the supply.
- For components intended to come into contact with food, the supplier must provide a Declaration of Compliance in accordance with European standards Regulation (EC) No. 1935/2004 and Regulation (EC) No. 2023/2006.
- For all other products or supplies, the supplier must provide the applicable documentation in each case.
- Level B suppliers, authorized for specific supply, will be continuously evaluated based on the inspection results upon receipt of the products.

